Parkland Memorial Hospital’s new Sterile Processing Center in Dallas needed a solution for moisture problems in its concrete floor prior to installation of Armstrong Medintech Tandem sheet vinyl. The hospital contractor wanted a permanent, guaranteed waterproofing system, that would be totally user and environmentally safe, and deliver minimum disruption to the client during the application. SCP 578 was the answer. The concrete substrate was mechanically prepared to remove all previous floor coating materials and provide a sound, clean porous substrate. After this, SCP 578 was spray-applied. The Sterile Processing Center was opened to foot traffic in 30 minutes and in 24-hours a skim coat was installed to remove any surface imperfections or prominent undulations. Spray-Lock® Premium Eco Adhesives were then used to finish this highly complex flooring project and provide a comprehensive guaranteed system. http://www.spraylockcp.com
No comments:
Post a Comment